How to Set Up Task Generation in LRM

How to configure Task Generation in LRM so your team's process runs automatically on every deal.

Written by Mikaila McLane

Task Generation automates the checklist work that happens every time a deal moves through your pipeline. Instead of relying on individuals to remember what needs to happen at each stage, you encode that process once and it runs automatically on every deal going forward.

How It Works

Admins configure task templates for each pipeline stage. When a project moves to that stage, the tasks for that stage are automatically created, attached to the project record, and ready to assign. The templates carry your team's non-negotiable steps — documents that must be attached, reviews that must be completed — so nothing critical gets skipped during the chaos of closing.

Setting Up Task Templates

Go to your pipeline settings and open Manage Task Automation. For each stage, you can create one or more task templates. Each template lets you set:

  • Task name — what needs to be done

  • Requirement level — Blocking (project can't advance until complete), Required, or Optional

  • Due date rule — how many days after stage entry the task should be due

  • Assignee — who the task auto-assigns to

  • File attachment required — whether a document must be attached before the task can be marked complete

  • Tag filter — if you only want the task to generate for projects with a specific tag, set it here. Useful when different deal types share a pipeline but need different checklists.

What Happens When a Project Moves Stages

When a team member moves a project to a stage with task templates, a transition dialog appears showing exactly which tasks will be created. They can review assignees, adjust optional tasks, and confirm before the move happens. Blocking tasks are clearly marked — if any are still open when someone tries to advance the project to the next stage, the platform will stop them and show what needs to be completed first.

Moving a Project Backward

If a project moves back to an earlier stage, the platform shows a warning listing which auto-generated tasks will be deleted. Tasks you created manually are kept.

Task Generation is available on Enterprise plans. Not on Enterprise yet? Talk to your account team.